GMCManchesterBanner
fatcowsmall

Monday, May 27, 2013

Trail work outings completed for the opening of summer hiking

Manchester section has completed 5 trail work days this month. As a result all the blowdowns have been removed and all the water bars (for drainage) have been cleaned out on our section of trail from Rt 11/30 to Griffith Lake. many thanks to all the adults who came out to work, the Mountain School at Winhall  students in grades 5-6-7-8 who came out to work, and the Burr Burton sophomores who built a new drainage ditch including some fine rock work.

No comments:

Post a Comment

This website is designed and
aboutPullout
archivePullout
followPullout
archivePullout1