GMCManchesterBanner
fatcowsmall

Sunday, May 25, 2014

Trail Work

We have completed all the blow down removal and water bar cleaning for the spring walk through of our trail section (Rt 11/30 to Griffith Lake) over four trips - three with groups from the Mountain School in Winhal and one with a dedicated group of adults. Thanks to all these volunteers for their hardwork. With the new norm of torrential rains, keeping those water bars open to help with drainage from the trail and decrease the speed of erosion is really critical.

No comments:

Post a Comment

This website is designed and
aboutPullout
archivePullout
followPullout
archivePullout1